• Sourcing Solutions
  • Services & Membership
  • Help & Community

Quick Details

  • Place of Origin: Shanghai, China (Mainland)
  • Brand Name: Platinum
  • Model Number: Container Houses
  • Material: Steel
  • Use: Hotel, House, Villa
  • Standard: ISO/CE/AS/US/CA for Modular Steel Construction
  • Roofing: Seamlock 410/Custom Orb838/Shingle/Color Bond/Blue Scope
  • Insulation: Fiberglass/ Rock wool
  • Features: Heat & Sound Insulation
  • Window: Aluminum Alloy Window, CE/AWA certificated
  • Main Material: Light Steel Frames Galv. Z275/Q345/AZ150/G550
  • Flooring: Laminated/Wooden/PVC/Carpet/tile
  • Using Life: 70 Years for Modular Steel Construction
  • Design: Plan & 3D Model & Structral Design
  • Fireproof: 4 Hours

Packaging & Delivery

Packaging Details: bulk cargo
Delivery Detail: Shipped in 45 days after payment
Product Description

1. Steel Grade:  yield strength ≥300MPa, Galv. Z275 and GB-Q345, yield strength ≥235 MPa

2. Size: 20FT and 40FT standard size or nonstandard size 

3. Standard: meet CE and Australian standards

4. Certification: ISO9001: 2008 , CE:EN1090 for Steel Construction;

Product Name
Container Houses/Modular House/Modular Steel Construction
Material
Light Gauge Steel/ LGS/Section Steel/AZ150/G550
Color
Roof Color: Slate Grey, Dark Blue, Sea Blue, Ivory White
Finishing Available
Roof, Exterior wall, Windows, Doors, Flooring, Kitchen cabinets, Bathroom etc. 
Products Show
Our Service

Design

Our engineers do structure drawings, 3D drawings and so on.

Manufacture

We do windows, doors, roofing, steel frames in our factory

Installation

We installed the villa in Mozambique.

Our Company

Factory

Our Factory
 Factory

Our Factory

Team

Our Team

Vistors from Sydney, Australia

Our Team

IBS Las Vegas - 2016

On Middle Jan, 2016, our team headed for Las Vegas
A great experience to open US market

Design Build Sydney - 2015

Late April, 2015, we joined the Design Build held in Sydney
Australia is our major market!

Packing & Delivery

Packing Details  : Standard shipping container packing

Delivery Details : around 60days after confirm the drawings and materials

1. Other materials will be delivered together with structure


Our Certifications

Qualified supplier

CE certificate for light gauge steel framing
Our company have ISO 9008: 2001 certificate.
AWA and CE certificate for Alluminium Alloy doors and windows
Meet EN-1090 regulations

Customer Photo

Spainish customer visiting factory

Italian Customer

Meeting regarding luxury prefab house and luxury container project

FAQ

1.Q: Are you a trading company or manufacturer ?

A: We are a manufactory. Our factory located in Fengxian District, Shanghai.

2.Q: What's the size of your factory

A: Around 8000 sqm.

3.Q: How many employees do you have ?

A: Around 100

4.Q: What is your terms of payment ?

A:30% deposit, 70% balance. 

T/T or L/C are acceptable.

5.Q: Could you please design a new and unique light steel prefab house for me?

A: Absolutely! We are able to provide you with not only construction scheme and structural drawings, but landscape design! Besides, detailed drawings and 3D models are surely included. One-stop service is our outstanding superiority with no doubt.

6.Q: What should I provide to build a light steel prefab house?

A: So easy! Sketch drawing would be a better reference for us. However, you will never mind if you don’t have any. Simply notify us your requirements, such as the area, usage and the storeys of the house. Before long, you’ll possess an amazing design.

7.Q: How could I ensure the cost of building a light steel prefab house?

A:Firstly, the designing scheme should be accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.

8.Q:How Long does it take to build a light steel prefab house?

A: It depends on the size of the house. Generally, the construction period of is 1 month of a 200-square-meter house by a construction team of 5-6 people. It only costs one week to build the steel structure frame.

9.Q:Is it difficult to build a prefab house?

A: Totally not, you can build the house independently according to the construction drawings as long as you know how to use an electric tool.

10.Q:Is light steel prefab house stable?

A: Set your hearts at rest! You are completely safe living in light steel prefab house even if there are hurricanes of 200km/h and 9-grade earthquake outside.

11.Q: What are the advantages of light steel prefab house comparing to the traditional building?

A: Better isolation of sound and heat,Better fireproof and anti-seismic,Wind resistance,Time and labour saving,More usable area,Excellent termite-proof capability

Transaction History of the Supplier

Below is the information about the supplier's transactions conducted via Alibaba.com. If you require further details regarding the transaction data, please contact the supplier directly.

Transaction Overview

Transactions

Transaction Details

This supplier has completedtransactions with buyers from .

Shipping Destination
Transaction Value
Transaction Date
Email to this supplier
Trade Assurance
China (Mainland) | Manufacturer, Trading Company
Transaction Level:
Supplier Assessments:
2 Transactions 20,000+
The supplier’s transactions conduted via Alibaba.com in the past 6 months.
The supplier supports Trade Assurance – A free service that protects your orders from payment to delivery.
Supplier's Trade Assurance Limit: US $75,000
Learn More